Dried adhesive can be cleaned with mineral spirits. Full cure in two weeks.Įxcess fresh adhesive can be removed with water. ![]() For additional information regarding subfloors, refer to the American Plywood Association (APA) bulletin, "APA Glued Floor System."ĭries in 24 hours. Subfloor must be under roof within 6 weeks of construction. Nail section into place with 8d annular or spiral nails 12" (30 cm) on center on all joists. Space joists the thickness of a putty knife to allow for wood expansion. Lay sheets with plywood face grain at right angle to joists. On supporting joists where sheets meet, lay two zig-zag 1/4" beads for added strength and to prevent squeaking. Subflooring (Conventional Tongue And Groove)įor added strength and to prevent squeaking, lay one 1/4" (.64 cm) zig-zag adhesive bead on each joist. to Flat SurfacesĪpply a 1/4" (.64 cm) bead near the outside edges throughout field in lines 12" apart. Allow 24 hours drying time before using construction area.įoam Insulation, Foamboard, Paneling, Corkboard, etc. If it's not, scrape off and apply fresh bead. Adhere materials within 15 to 20 minutes of gunning adhesive. 61 50+ viewed in past week 24565 - 33879 Seal Spray Sub-Floor and Construction Polyurethane Adhesive (Case of 12/25.4oz Cans) 1 11999 (10. LIQUID NAILS Subfloor & Deck Construction Adhesive, LN-602/LNP-602, is a specially formulated weatherproof-grade adhesive for interior and exterior. LN-902 can be applied at temperatures as low as 22° F (-6 degrees C).Ĭondition LN-902 to at least 40° F (4° C) for easier gunning. Wood may be damp, but the adhesive will take longer to dry. Make sure that all surfaces are clean, structurally sound and free of excess water. This may vary due to temperature, humidity amount of product applied and surface porosity. ![]() * Please note that the typical dry time for most construction adhesives is approximately 24 hours. ![]() Increasing the structural integrity of walls and subfloor systems using plywood, waferboard, lumber and treated lumber, particleboard and foamboard.īonding underlayment directly to concrete or for uses other than subfloor, deck and wall system installation.Ģ8 fl. oz. GREENGUARD Children & SchoolsSM Certification.Plus, no running or dripping even at 120°!Ĭontributes toward NAHB National Green Building Standard™ certification of the structure Specially formulated to adhere to wet or frozen lumber in temperatures as low as 22°.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |